Bible College Property Development Updates

IMG_1724The two dorms have been completed from four shipping containers, and a 40’ bathroom block has also been completed and we are happy to report there is now a large concrete slab between the two dorms (there will be a third dorm completing the “U” as funds come in) for a gathering place for the students and a way to keep the dorms cleaner.

Another significant move ahead is that GBC campus has its own electric meter and lines. The water lines have also been installed.

IMG_1740Thirdly, the roof on the Memorial Chapel has been sealed and prepped for the monsoon season that will begin shortly.

FIMG_1728ourthly, the bunkbeds have been moved into the new dorms and have received a fresh coat of paint ready for re-assembly. We need 10 more bunkbeds at $150 each and would ask that you pray with us for this need.